MESA J Workshops & MESA A Laboratory (Rio Tinto Pilbara)
YEAR: 2020
CLIENT: Decmil
SERVICES UTILISED: BIM modelling
OVERVIEW:
The Mesa J mine is part of the Robe Valley hub, which is owned by the Robe River Joint Venture. Rio Tinto has a 53% stake in the JV and is operator of Robe Valley, which has two iron ore producing mines in Mesa A and Mesa J. The project was included HV wash down facility, mobile equipment maintenance workshop (MEM Workshop), bulk lube storage facility, and HV and LV tyre change facilities.
KEY HIGHLIGHT:
Steel Tonnage: 460 tons
Over 4,500 shop drawings were generated for steelwork.
Ilam HDPE Project (Oil & Gas)
YEAR: 2008
CLIENT: EIED
SERVICES UTILISED: BIM modelling
OVERVIEW:
This project involved the construction of a High-Density Polyethylene (HDPE) plant located in Ilam. The plant will have a production capacity of 300,000 tonnes per year of different grades of HDPE including Black Pipe. Its main feed is the ethylene product of the adjacent Ethylene Plant in the Ilam Petrochemical Complex.
DRI HANDELING TO DIRECT (Material Handling)
YEAR: 2020
CLIENT: EMMC
SERVICES UTILISED: BIM modelling
OVERVIEW:
This project includes conveyors, transfer station, trestles, and end platform.
KEY HIGHLIGHT:
Steel Tonnage: 3,100 tons